OUR PROCESS

Convenient and stress free

We provide a complete professional service working with Architects, Designers & Clients.

Detailed pricing, Detailed design collaboration, Project co-ordination with all trades from plans to completion.

Hewe does things the right way, working in with everyone involved.

DESIGN

We work with your Architects, Designer & Builders collaborating on detailed plans for your designed cabinetry throughout the home.

MANUFACTURING

Once all drawings have been finalised, we start programming your cabinetry for computerised and precise cutting. Our experienced cabinetmakers, most with background in the superyacht industry will ensure the highest quality craftsmanship. Once all your joinery is built and set up in our factory, we invite you for a factory inspection prior to its disassembly for painting. The manufacturing process typically takes 6-8 weeks from sign-off to installation.

PROJECT COORDINATION

Before and during manufacturing we co-ordinate site measures and the other trades involved to get the building site, plumbing, electrics and other services in the right place in time for installation.

INSTALLATION

We install into rooms with finished walls, ceilings and floors. Clear access is required.

Our installers meet on site and unload your cabinetry straight into the room where it is being installed. Bench top and splashback templating takes place as soon as the cabinets are installed. Templated benchtops and splashbacks generally take around 2-4 weeks to be manufactured and installed. Once installed we may require an extra site visit to do final adjustments and to silicone all cabinetry to walls and floors.